Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›AIE Wants to Increase Annual LNG Cargo Shipments at Port Kembla Gas Terminal
Green Marine

October 25, 2019 · about 6 years ago

AIE Wants to Increase Annual LNG Cargo Shipments at Port Kembla Gas Terminal

AIE seeks to increase the number of annual LNG cargoes from 26 to 46 shipments.

2 minutes read
  • LinkedIn
  • X
  • Email

Australian Industrial Energy (AIE), a consortium of companies focused on the energy sector, has lodged a modification to its existing development consent for its Port Kembla Gas Terminal with the New South Wales Government.

As explained, the modification seeks to allow greater volumes of natural gas to flow through the facility for six months of the year.

Specifically, the consortium has requested to increase the number of annual LNG cargoes received at the terminal from 26 shipments of standard-sized vessels of 170,000 cubic meters to up to 46 shipments of variable-sized carriers to reflect the variability in demand.

The increase of up to 20 shipments represents an approximate 2 percent increase in the number of vessels that visit Port Kembla each year, according to AIE.

The move has been prompted by customers expressing a demand for natural gas during the winter months, which exceeds the volumes approved in the current consent for the project.

The project’s floating storage and regasification unit (FSRU), which will remain moored at Port Kembla’s Berth 101 to receive, store and send out natural gas, will not need to be modified as it has the capacity to handle the extra throughput, the consortium explained.

As part of the modification process, AIE will be required to undertake additional environmental and hazard studies which will then be assessed by NSW Government agencies. Whilst this is expected to extend the completion timeline, the request for additional volume reinforces the project’s critical importance as a solution to the nation’s near-term gas supply challenges, AIE added.

Related:

AIE Gets Green Light for NSW’s First LNG Terminal

AIE: Construction Contract Granted for NSW’s 1st LNG Import Terminal

Hoegh LNG to Provide FSRU for Port Kembla Gas Terminal

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free