Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Netherlands, Denmark Inaugurate COBRAcable Interconnector
Storage

November 4, 2019 · about 6 years ago

Netherlands, Denmark Inaugurate COBRAcable Interconnector

An official inauguration event for the 700MW COBRAcable subsea interconnector is being held today, 4 November, in both Eemshaven (the Netherlands) and Endrup (Denmark), in the presence of representatives from the Dutch and Danish ministries. According to Prysmian, the cable supplier for the project,

1 minutes read
  • LinkedIn
  • X
  • Email

An official inauguration event for the 700MW COBRAcable subsea interconnector is being held today, 4 November, in both Eemshaven (the Netherlands) and Endrup (Denmark), in the presence of representatives from the Dutch and Danish ministries.

According to Prysmian, the cable supplier for the project, the inauguration follows the successful completion of the HVDC test on the interconnector.

Prysmian supplied and installed a ±320 kV HVDC bipole system, using single-core cables with extruded insulation technology and running for a total route of around 325 km, from Eemshaven to Endrup via the German North Sea sector. The project includes two onshore lengths of 1km on the Dutch side and 25km on the Danish side that connect the two onshore converter stations, provided under a separate contract by Siemens.

The 325km subsea high-voltage direct current cable is an initiative of TenneT and the Danish electricity and gas grid operator Energinet.

Construction of the COBRAcable started in 2016 and was completed earlier this year.

The COBRA cable will enable the Netherlands to import more renewable energy, mainly wind energy, from Denmark. The cable connection has been designed in such a way that it will also be possible to connect an offshore wind farm at a later stage.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago