Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Woodside bumps Scarborough resource volumes 52 pct
Clean Fuel

November 8, 2019 · about 6 years ago

Woodside bumps Scarborough resource volumes 52 pct

Australian LNG player Woodside said that the estimated gross contingent resource dry gas volume for the Scarborough field has increased to 11.1 Tcf, 53 percent up from 7.3 Tcf.

2 minutes read
  • LinkedIn
  • X
  • Email

Australian LNG player Woodside said that the estimated gross contingent resource dry gas volume for the Scarborough field has increased to 11.1 Tcf, 53 percent up from 7.3 Tcf.

Woodside’s interest in Greater Scarborough (covering the Scarborough, Thebe and Jupiter fields) comprises a 75 percent interest in WA-1-R (which contains the majority of the Scarborough field) and a 50 percent interest in each of WA-61-R, WA-62-R and WA-63-R, Woodside, the operator of these retention leases, said in its statement.

As a result of the Scarborough resource volume increase, Greater Scarborough contains an estimated gross dry gas contingent resource volume of 13.0 Tcf, a 41 percent increase from the previous 9.2 Tcf.

The increased volume estimates follow the completion of integrated subsurface studies incorporating full-waveform inversion (FWI) 3D seismic reprocessing and updated petrophysical interpretation.

The new FWI 3D seismic reprocessing improved the reservoir imaging quality and increased reservoir sand distribution. In addition, a comprehensive integrated review of the wireline log data and measurements from special core analysis has increased net sand proportion and gas saturations.

Woodside’s overall Corporate Contingent Resources (2C) have increased by 503 MMboe to 6,020 MMboe.

Woodside is targeting a final investment decision for the development of the Scarborough gas resource in the first half of 2020.

Scarborough gas would be initially processed on a deep-water floating production unit and transported through an approximately 430 km pipeline to a proposed second LNG production train at the existing Woodside-operated Pluto LNG facility on Western Australia’s Burrup Peninsula.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free