Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›US Gov’t Awards USD 20 Mn for Conley Container Terminal Upgrade
Green Marine

November 13, 2019 · about 6 years ago

US Gov’t Awards USD 20 Mn for Conley Container Terminal Upgrade

Massport will receive a USD 20 million grant from the US government for the upgrade of the Conley Container Terminal.

2 minutes read
  • LinkedIn
  • X
  • Email

The Massachusetts Port Authority (Massport) will receive a USD 20 million grant from the US government for the upgrade of the Port of Boston’s Paul W. Conley Container Terminal.

The funding for the Conley Terminal Container Storage and Freight Corridor project is part of the USD 900 million investment in American infrastructure announced by the US Department of Transporation on November 12, 2019.

“The Administration is targeting BUILD Transportation grants to repair, rebuild, and revitalize significant infrastructure projects across the country,” US Secretary of Transportation Elaine L. Chao explained.

Conley Terminal is the only full-service container terminal in New England. In FY2019, Conley Terminal set a new record in cargo volumes for the fifth consecutive year when it handled 307,331 twenty-foot equivalent units (TEUs), an 8% increase over FY2018.

A few years ago, Massport unveiled a massive investment program in an effort to keep Conley Terminal competitive.

Under the program, one of the major infrastructure projects is the Boston Harbor Dredging Project. The maintenance dredging of the inner harbor was completed in December of 2017. The deepening of the main ship channels began in July 2018, aiming to enable the terminal to accommodate large container vessels. According to Massport, the project is 64% complete, with over 7.4 million cubic yards removed to date.

Earlier this month, the terminal received two new rubber-tired gantry cranes (RTGs), increasing the number of RTGs at Conley Terminal to sixteen. In addition, Massport ordered three new ship-to-shore cranes, which are 160 feet high with an outreach of 22 containers wide, to be delivered in late 2020.

Apart from the new ship-to-shore cranes, Conley Terminal improvements include the construction of two 50-foot berths, expanded reefer storage, and new in-and-out gate facilities.

Following the completion of the infrastructure buildout, the terminal is expected to be able to handle vessels in the 12,000-14,000 TEU range.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free