Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Rovco Wraps Up ROV Inspection at Galloper Offshore Wind Farm
Operations & Maintenance

November 20, 2019 · about 6 years ago

Rovco Wraps Up ROV Inspection at Galloper Offshore Wind Farm

Rovco has completed an extensive remotely operated vehicle (ROV) inspection contract for the Galloper offshore wind farm. The circa £1 million contract has resulted in completion of the baseline asset integrity survey at the Galloper, a 353MW installed capacity wind farm which lies 30km off the coas

2 minutes read
  • LinkedIn
  • X
  • Email

Rovco has completed an extensive remotely operated vehicle (ROV) inspection contract for the Galloper offshore wind farm.

The circa £1 million contract has resulted in completion of the baseline asset integrity survey at the Galloper, a 353MW installed capacity wind farm which lies 30km off the coast of Suffolk, UK.

Rovco deployed a Cougar XT ROV for the project, awarded by Innogy Renewables UK, fitted with both 3D imaging sonar and its SubSLAM 3D technology to complete planned asset inspection activities. The project was performed from the DP2 support vessel, Atlantic Voyager.

A second ROV inspection campaign to assess internal foundations is due to mobilize this month.

The Bristol-headquartered firm has utilized its technology to inspect all 56 turbines at the Galloper wind farm, which generates enough green electricity to power the equivalent of 380,000 homes.

Data for this project is being delivered via Rovco’s in-house Data Command Centre, a proprietary software system which allows for all the various datasets collected to be combined and presented through a simple internet browser.

Brian Allen , CEO and founder of Rovco, said: “This project demonstrates the future of offshore inspection. Innogy is the first of our customers to complete a whole field 3D inspection, the data they’ve obtained will go a long way to enabling and ensuring better asset integrity and knowledge of their infrastructure. The success of this project is also a testament to the efforts of our talented employees who work extremely hard to achieve the incredibly high standards evident within our inspection services.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago