Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›HSM Offshore Rolls Out Borssele Beta Topside
Storage

December 2, 2019 · about 6 years ago

HSM Offshore Rolls Out Borssele Beta Topside

HSM Offshore BV has rolled out the topside for the Borssele Beta offshore high voltage substation at its yard in Schiedam, the Netherlands. Once completed in 2020, the 700MW Borssele Beta will connect the 731.5MW Borssele 3 & 4 wind farm to the Dutch grid. The offshore construction on the wind farm

1 minutes read
  • LinkedIn
  • X
  • Email

HSM Offshore BV has rolled out the topside for the Borssele Beta offshore high voltage substation at its yard in Schiedam, the Netherlands.

Once completed in 2020, the 700MW Borssele Beta will connect the 731.5MW Borssele 3 & 4 wind farm to the Dutch grid. The offshore construction on the wind farm started in October and the commissioning is scheduled for 2021.

The substation’s jacket foundation, also built by HSM Offshore, was installed at the site off Zeeland in May.

HSM Offshore was also in charge of building and delivering the Borssele Alpha substation. Completed back in September, the 700MW Borrssele Alpha will connect the Borssele 1+2 offshore wind farm to the Dutch grid.

The wind farm is located some 22 kilometres offshore Zeeland and will comprise 94 Siemens Gamesa 8MW turbines slated for commissioning in 2020.

The Borssele Alpha and Beta platforms are the first large-scale grid connections to be constructed under the National Energy Agreement for offshore wind farms in the Netherlands.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago