Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Equinor, Prysmian Ink Empire Wind Inter-Array Cables Deal
Equipment

December 5, 2019 · about 6 years ago

Equinor, Prysmian Ink Empire Wind Inter-Array Cables Deal

Prysmian Group and Equinor have signed agreement for the supply of the submarine inter–array cable system for the Empire Wind project, an 816 MW offshore wind project in New York. Prysmian Group will provide the 66 kV XLPE-insulated inter-array cable system that will transmit power from the wind tur

2 minutes read
  • LinkedIn
  • X
  • Email

Prysmian Group and Equinor have signed agreement for the supply of the submarine inter–array cable system for the Empire Wind project, an 816 MW offshore wind project in New York.

Prysmian Group will provide the 66 kV XLPE-insulated inter-array cable system that will transmit power from the wind turbines with a capacity in the range of 10-15 MW.

The construction of the cable system’s power cores is set to begin by December 2019.

“This agreement marks an important step forward in the development of Empire Wind and will allow us to transport twice as much power over a single inter-array cable as current industry practice. The agreement with Prysmian will help ensure that Empire Wind brings affordable and renewable energy to New Yorkers as efficiently as possible,” said Christer af Geijerstam , president of Equinor Wind US.

“ We are proud to support Equinor in this important challenge, providing North American power grids with our top-quality cables, our expertise and cutting-edge technologies able to support the clean energy transition in the US,” said Hakan Ozmen , EVP, Projects Business Unit, Prysmian Group.

Prysmian Group will be responsible for the design, supply and storage of approximately 150 km of 66 kV XLPE-insulated inter-array cables, which will transmit twice the current industry standard ensured by 33 kV systems.

The extensive cable system will undergo continuous fabrication at Prysmian’s centres of excellence in Montereau (France) and Nordenham (Germany) and its completion is expected in the summer of 2022 and the final installation in 2023 or 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

19 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

19 days ago