Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Wood to Prep Equinor’s O&G Platforms for Offshore Wind
News

December 11, 2019 · about 6 years ago

Wood to Prep Equinor’s O&G Platforms for Offshore Wind

Wood has been awarded a new contract by Equinor to deliver modifications to two offshore installations in the Norwegian North Sea to connect electric power from the Hywind Tampen floating wind farm. Equinor’s project replaces energy generated by gas turbines with electricity from the 88MW floating w

1 minutes read
  • LinkedIn
  • X
  • Email

Wood has been awarded a new contract by Equinor to deliver modifications to two offshore installations in the Norwegian North Sea to connect electric power from the Hywind Tampen floating wind farm.

Equinor’s project replaces energy generated by gas turbines with electricity from the 88MW floating wind farm located between the Snorre and Gullfaks fields.

As part of the three-year contract, Wood will provide the topside modifications necessary for the Snorre A and Gullfaks A platforms to integrate the Hywind Tampen with existing systems powering the facilities.

The scope of work also includes equipment installation on the floating wind turbines and upgrades to the onshore control room in Bergen which will remotely operate the wind farm.

Dave Stewart , CEO of Wood’s Asset Solutions business in Europe, Africa, Asia & Australia, said: “The Snorre A and Gullfaks A facilities will be the first oil and gas platforms to be powered by a floating offshore wind farm. We are proud to support Equinor on what is a flagship project for the North Sea’s energy transition journey.”

Hywind Tampen will comprise 11 Siemens Gamesa 8MW wind turbines mounted on floating concrete substructures. The wind farm will be able to meet around 35% of the annual power demand of the Snorre A and B, and Gullfaks A, B and C oil & gas platforms.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago