Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Velesto to provide jack-up rig for Mubadala’s Pegaga campaign
Business & Finance

December 12, 2019 · about 6 years ago

Velesto to provide jack-up rig for Mubadala’s Pegaga campaign

Velesto Drilling has been awarded a contract by UAE-based Mubadala Petroleum for the provision of a jack-up drilling rig for Pegaga development drilling campaign offshore Malaysia.

1 minutes read
  • LinkedIn
  • X
  • Email

Malaysia’s Velesto Drilling has been awarded a contract by UAE-based Mubadala Petroleum for the provision of a jack-up drilling rig for Pegaga development drilling campaign offshore Malaysia.

Velesto said on Wednesday that the contract was for seven firm wells and the contract value was estimated at $30 million.

The contract is expected to start in the second quarter of 2020. Velesto will use its Naga 4 jack-up to undertake the works.

According to information on Bassoe Offshore, the contract will start in May 2020 and end in May 2021. The dayrate estimate is $80,000.

The Naga 4 is a premium independent-leg cantilever jack-up drilling rig that has a drilling depth capability of 30,000 feet and has a rated operating water depth of 400 feet.

Mubadala sanctioned the development of the Pegaga gas field offshore Sarawak Malaysia in March 2018. The Pegaga gas field is located in the Central Luconia province, offshore Sarawak at about 108 meter water depth.

The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket. The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.

The produced fluids will be sent through a new 38 inch subsea pipeline tying in to an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu. First gas is expected in 2021.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago