Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›GEO.xyz Wins Thor UXO Box Survey Contract
Project & Tenders

December 20, 2019 · about 6 years ago

GEO.xyz Wins Thor UXO Box Survey Contract

The project will be built off Nissum Fjord in the North Sea and is expected to feature 13-15MW turbines set to be operational between 2024 and 2027.

1 minutes read
  • LinkedIn
  • X
  • Email

Denmark’s transmission system operator Energinet has awarded GEO.xyz BVBA with a contract to carry out unexploded ordnance (UXO) box survey for the Thor offshore wind project.

Energinet is performing the initial geophysical and geotechnical investigations prior to the procurement of the Thor wind farm.

The UXO box survey will be carried out to minimize the UXO risk for the geotechnical investigations, planned to commence in April 2020.

The survey will be performed in approximately 100 rectangular zones and will include magnetometer, side scan sonar (SSS), and multi-beam echo-sounding (MBES) surveys.

The deliverables requested under this contract include a fast track data package, an operational survey report, an interpretative survey report, and digital deliverables. The contract’s duration is three months and the value of the contract is EUR 670,000.

Thor will be located in Nissum Fjord at a distance of at least 20 kilometres from the shore of Jutland. The wind farm will have a capacity of between 800MW and 1,000MW and will feature wind turbines with an individual capacity of between 13MW and 15MW.

The commissioning of the wind farm is expected between 2024 and 2027.

Last year, the Danish parliament unanimously voted for a new energy agreement which includes building three new offshore wind projects by 2030 with a total capacity of at least 2.4GW. Thor is the first of those projects.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago