Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Mech-Tool Engineering Wins Hollandse Kust Zuid Alpha Work
News

December 24, 2019 · about 6 years ago

Mech-Tool Engineering Wins Hollandse Kust Zuid Alpha Work

DryDocks World has awarded Mech-Tool Engineering (MTE) with a contract to deliver fire and blast solutions to the Hollandse Kust Zuid Alpha project. MTE will design, engineer, fabricate, and supply its A0 fire-rated and Non-Rated (NR) external and internal profiled wall panels for the offshore platf

1 minutes read
  • LinkedIn
  • X
  • Email

DryDocks World has awarded Mech-Tool Engineering (MTE) with a contract to deliver fire and blast solutions to the Hollandse Kust Zuid Alpha project.

MTE will design, engineer, fabricate, and supply its A0 fire-rated and Non-Rated (NR) external and internal profiled wall panels for the offshore platform.

MTE has recently started the fabrication of the walls in the Mech-Tool Korea facility.

“The confidence shown by DryDocks World Dubai and their client Petrofac, in selecting Mech-Tool Engineering as the successful bidder for the supply of the fire rated walling package is of great importance to us,” Craig Rose , MTE’s BD Strategy & Proposals Director, said.

”The MTE Renewable division are proud to continue the trusted association with Petrofac following-on from the recent Galloper topsides project and we look forward to the growth of a valued relationship with the world class DDWD Yard of the UAE.”

Drydocks World is responsible for the construction, engineering, commissioning and load-out of the 700MW topside for the Alpha platform .

The 2,800t jacket is expected to be installed in the second quarter of 2020, with the 3,800t topside following in the fourth quarter of next year. The platform will go into service in 2021.

The 1.4GW Hollandse Kust Zuid zone comprises four offshore wind farms that will be connected to both the Alpha and Beta substations. The wind farms are being developed by Vattenfall.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago