Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Santos Submits Plan for Keraudren Extension Seismic Survey
Operations & Maintenance

December 25, 2019 · about 6 years ago

Santos Submits Plan for Keraudren Extension Seismic Survey

Santos has submitted an environment plan to National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for the Keraudren Extension 3D Marine Seismic Survey, offshore Australia. Santos proposed to undertake a 3D seismic marine survey over a portion of exploration permit areas

2 minutes read
  • LinkedIn
  • X
  • Email

Santos has submitted an environment plan to National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) for the Keraudren Extension 3D Marine Seismic Survey, offshore Australia.

Santos proposed to undertake a 3D seismic marine survey over a portion of exploration permit areas WA-435-P, WA-436-P, WA-437-P and WA-438-P, and surrounding waters in the Bedout Sub-basin in Commonwealth waters off the coast of Western Australia.

The survey data is required to develop regional geologic models to inform the exploration permit retention strategy, and the potential location of future drilling of exploration and development wells.

The survey may be acquired in stages. The exact area to be acquired in each stage will be determined based on operational and timing factors, and in consultation with key stakeholders.

To allow for flexibility a period of three years, between 2020 to 2022, is proposed in which to complete the survey. It is Santos’ intention to begin the survey in 2020 and to acquire the full survey within two of the three years.

In order to avoid sensitive fish spawning and whale migration periods, acquisition of the survey will only be undertaken between 1 February to 31 July in any given year. The first phase of acquisition is unlikely to commence before April 2020.

The survey will take at least 132 days to complete, with operations occurring on a 24-hour basis. An additional 30 days of contingency time within the operational area has been provided as part of the environmental assessment.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago