Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Saipem Taps Cathie for Neart na Gaoithe Job
Business & Finance

January 10, 2020 · about 6 years ago

Saipem Taps Cathie for Neart na Gaoithe Job

Geoscience and geotechnical engineering consultancy Cathie has been contracted by Saipem to provide interpretation of the geotechnical conditions encountered at the Neart na Gaoithe (NnG) offshore wind farm situated off the Fife coast in the UK. Cathie has also played a key role in the characterizat

1 minutes read
  • LinkedIn
  • X
  • Email
Saipem Taps Cathie for Neart na Gaoithe Job

Geoscience and geotechnical engineering consultancy Cathie has been contracted by Saipem to provide interpretation of the geotechnical conditions encountered at the Neart na Gaoithe (NnG) offshore wind farm situated off the Fife coast in the UK.

Cathie has also played a key role in the characterization and interpretation of the geophysical and geotechnical data, and the drafting of Geotechnical Interpretative Report alongside providing specialist support in the certification of the proposed foundation design methods.

Cathie has been involved in the NnG wind farm since 2011, supporting the initial stages of development.

Over approximately 8 years, they have provided geophysical and geotechnical survey consultancy, seabed risk management, and ground modelling.

Victor Terente , UK engineering manager at Cathie said, “We’re glad to be a part of the NnG offshore wind farm, providing dedicated support not only during the initial investigation stages but also during the wind farm foundation design process. We are confident that our geotechnical assistance will help achieving the certification of the proposed geotechnical design of the piles.”

Gareth Ellery , business development director, added, “ The Cathie team have leveraged every kW from over 40GW of global offshore wind experience to secure project value and positive outcomes for the NnG wind farm. Long term project involvement such as this is great for us and great for our clients. It is very satisfying to be able to see this project through detailed design and beyond into construction.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago