Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›NKT Wins Service Contract for East West Interconnector
Project & Tenders

January 14, 2020 · about 6 years ago

NKT Wins Service Contract for East West Interconnector

NKT has secured a cable service contract with Irish power grid operator EirGrid for the East West Interconnector between Ireland and Great Britain. Under the five-year service agreement, NKT will carry out repair works for the 200kV HVDC power cable with a capacity of 500MW. The deal includes inspec

2 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

NKT has secured a cable service contract with Irish power grid operator EirGrid for the East West Interconnector between Ireland and Great Britain.

Under the five-year service agreement, NKT will carry out repair works for the 200kV HVDC power cable with a capacity of 500MW.

The deal includes inspection and spare part maintenance, fault locating, vessel preparedness guarantee, offshore cable handling, off- and onshore cable jointing work, engineering and monitoring analysis.

The company said it will be providing jointing technicians, as well as tailored vessels, equipment and specially designed tools for service operations.

For NKT, the agreement marks the first contract including the company’s recently launched ten days vessel mobilization guarantee.

According to NKT, the service work will be carried out in accordance with a tailored preparedness plan to reduce the potential outage time in case of unexpected damages to both the onshore and offshore parts of the East West Interconnector.

“It is a pleasure to see our vessel mobilization guarantee being well-received in the market where we see a growing demand for service agreements as the focus on uptime is increasing ,” said Oliver Schlodder , Executive Vice President and Head of Applications, Service and Accessories at NKT.

“ The level of preparedness makes a critical difference for the potential downtime of a power cable and we are happy to support EirGrid with our service expertise to ensure maximum uptime of the East West Interconnector.”

The 500MW East West Interconnector, which runs between Deeside in north Wales and Woodland, County Meath in Ireland, officially opened in 2012.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago