Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›NEC Qualifies 20 Fiber Pair Subsea Telecom Cables
Business & Finance

January 16, 2020 · about 6 years ago

NEC Qualifies 20 Fiber Pair Subsea Telecom Cables

NEC Corporation and its subsidiary OCC Corporation have completed full qualification of subsea repeaters and optical cable containing up to 20 fiber pairs (40 fibers). This is a 25% improvement in fiber count over 16 fiber pair systems previously built by NEC. This development allows cable owners wo

2 minutes read
  • LinkedIn
  • X
  • Email
NEC Qualifies 20 Fiber Pair Subsea Telecom Cables

NEC Corporation and its subsidiary OCC Corporation have completed full qualification of subsea repeaters and optical cable containing up to 20 fiber pairs (40 fibers).

This is a 25% improvement in fiber count over 16 fiber pair systems previously built by NEC.

This development allows cable owners worldwide to construct subsea telecom cables capable of the highest traffic capacity, while optimizing the cost per bit of the wet plant.

NEC said it has achieved this with only minor modifications to its proven repeater and cable designs. This was done by optimizing key repeater components, and by proving that its existing cable design could easily accommodate more fibers.

The 20 fiber pair repeaters continue to use quadruple pump sharing technology, first introduced by NEC in 2010, for high optical and electrical efficiency.

OCC’s 20 fiber pair cable can be manufactured using a wide range of existing optical fibers, according to the needs of each new cable system.

Furthermore, OCC has demonstrated to its customers that they can visually identify individual fibers using a combination of ring marking and conventional fiber coloring. This allows the potential number of fibers in a cable to be greatly expanded. Significantly, in OCC cable, the fiber’s transmission performance is completely unaffected, either by the fiber coloring or cabling processes.

“ As global capacity demand continues to soar, NEC is committed to helping our customers scale up their networks in a cost-effective way,” said Takaaki Ogata , executive technical manager of NEC’s Submarine Network Division. “Further significant increases in the fiber pair count of NEC’s wet plant are coming soon,” he added.

Mass production of the newly-qualified wet plant has started.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago