Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›Remotely Controlled Survey Wraps Up at Greater Gabbard
Research & Development

January 22, 2020 · about 6 years ago

Remotely Controlled Survey Wraps Up at Greater Gabbard

XOCEAN’s XO-450 unmanned surface vessel (USV) has carried out survey work at the Greater Gabbard offshore wind farm in the UK. The XO-450 conducted seabed surveys on seven of the project’s 140 turbines over the weekend at the site located 23km off the coast. The vessel was remotely controlled from s

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

XOCEAN’s XO-450 unmanned surface vessel (USV) has carried out survey work at the Greater Gabbard offshore wind farm in the UK.

The XO-450 conducted seabed surveys on seven of the project’s 140 turbines over the weekend at the site located 23km off the coast.

The vessel was remotely controlled from shore, representing a first for the offshore wind sector, innogy said.

Throughout the survey, the data collected was monitored from shore in real-time to validate data collection before the vessel departed the work locations.

According to the company, the unmanned vessel is around the size of an average car (4.5m) and half its weight (750kg), and can be monitored and controlled 24/7 via a satellite connection by a team at an onshore control center.

“We are constantly looking for innovative ways in which we can operate our fleet of renewables assets,” said Jeremy Williamson , SSE Renewables Head of Operations.

“XOCEAN’s vessel will allow us to carry out our work in a more efficient, and most importantly for SSE Renewables and our partners innogy, in the safest way possible. We’re really interested to see how this sort of work can help improve our industry and look forward to working with XOCEAN in future.”

The 500MW Greater Gabbard offshore wind farm comprises 140 Siemens 3.6MW turbines that were fully commissioned in September 2012.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

AUV can operate at depths of up to 6,000 meters collecting high-resolution data; Credit: Jørgen Ramse Vadla
Authorities & Government

Advanced underwater vehicle goes on first mission to chart Norwegian Sea’s subseascape

about 1 month ago

ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

AUV can operate at depths of up to 6,000 meters collecting high-resolution data; Credit: Jørgen Ramse Vadla
Authorities & Government

Advanced underwater vehicle goes on first mission to chart Norwegian Sea’s subseascape

about 1 month ago
ACUA's Pioneer USV in Plymouth Sound; Source: ACUA Ocean
Automation

UK’s testbed on the lookout for partners after spotlighting subsea range with multi-robot demo

about 1 month ago