Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›VLCV BV Finishes Borssele Cable Gig
Storage

January 22, 2020 · about 6 years ago

VLCV BV Finishes Borssele Cable Gig

VLCV BV has completed the installation of two ducts, including bellmouths, for the cable system of the Borssele offshore wind project in the Netherlands. VLCV used the direct drill technique which consists of an onshore prefabricated pipeline that is directly connected with a drill head and installs

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

VLCV BV has completed the installation of two ducts, including bellmouths, for the cable system of the Borssele offshore wind project in the Netherlands.

VLCV used the direct drill technique which consists of an onshore prefabricated pipeline that is directly connected with a drill head and installs in one pass after which the drill head is disconnected.

Two direct drill and duct installations of approximately 450m were made from a barge positioned on the mudflat towards the exit pit in the Western Scheldt seabed at ~50m of depth.

“Today I can proudly announce that both ducts and Bellmouths have been successfully installed. Our teams have been working hard since October on the successful installation of both ducts,” said Arvid de Groot , Project Manager at VLCV B.

VLCV said it had designed the drilling plan for the project considering the subsoil conditions, strength calculations and mud pressure.

After drilling and installation of the duct, the drill head was removed with a special disconnecting system. A DP2 vessel with a Work Class ROV recovered the drill head and installed the two bellmouths with the use of special drill tools operated from the barge.

The bellmouths will be temporarily closed with a special plug to seal the pipe ready for the cable pull-in works that will take place at a later stage, the company said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago