Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Orient Cable Gets LoA for Offshore Wind Farm Project
Project & Tenders

February 5, 2020 · about 6 years ago

Orient Cable Gets LoA for Offshore Wind Farm Project

Orient Cable, a provider of power cables based in Ningbo, has received a Letter of Award (LoA) from China Three Gorges New Energy (CTG) for Guangdong Yangjiang Shaba-West Phase II offshore wind farm project. The contract includes the supply of 178km of cable, 62km 220kV export cable and 116km 35kV I

1 minutes read
  • LinkedIn
  • X
  • Email
Orient Cable Gets LoA for Offshore Wind Farm Project

Orient Cable, a provider of power cables based in Ningbo, has received a Letter of Award (LoA) from China Three Gorges New Energy (CTG) for Guangdong Yangjiang Shaba-West Phase II offshore wind farm project.

The contract includes the supply of 178km of cable, 62km 220kV export cable and 116km 35kV IAC.

This is the second total package project obtained by Ningbo Orient Wires & Cables after winning the first phase in July 2018, the company noted.

The Phase II of the wind farm will have approximately 400MW of installed capacity. Two circuits of export cables will be connected from one 220kV offshore substation platform to onshore centralized control center.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free