Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›TenneT Seeks Representative During 525 kV Cable Tests
Offshore Wind

February 11, 2020 · about 6 years ago

TenneT Seeks Representative During 525 kV Cable Tests

TenneT TSO B.V. has issued a tender call for technical inspection services during the testing of a 525 kV High Voltage Direct Current (HVDC) cable system. TenneT plans to develop 2GW offshore grid connection systems to integrate offshore wind farms into the Dutch and into the German power grid. To b

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

TenneT TSO B.V. has issued a tender call for technical inspection services during the testing of a 525 kV High Voltage Direct Current (HVDC) cable system.

TenneT plans to develop 2GW offshore grid connection systems to integrate offshore wind farms into the Dutch and into the German power grid.

To be able to transport the required 2GW power, a submarine cable system operating at a voltage level 525 kV DC is needed.

TenneT initiated a development programme for the 525 kV DC submarine cable system and received positive responses from cable manufacturers in Europe and Asia.

Based on the development programme, cable manufacturers will perform tests resulting in a test certificate and a report.

The tests are expected to be performed by the cable manufacturer in the period from the third quarter of 2020 to the first quarter of 2021.

Through this tender, TenneT is seeking a consultant to attend the tests performed by cable manufacturers; be the ‘eyes and ears’ of TenneT during the tests, and check if the tests are performed according to planning, applicable standards, and TenneT requirements.

The tender remains open until 9 March.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindProject & TendersStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free