Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Heerema’s Aegir Wraps Up Installation Work for Qatargas
Operations & Maintenance

February 26, 2020 · about 6 years ago

Heerema’s Aegir Wraps Up Installation Work for Qatargas

Heerema’s Aegir vessel has finalized the installation of the 4.000 mT jacket and topside for Qatargas’ North Field Bravo Living Quarters Expansion project. The Aegir firstly mobilized to Qatar’s Ras Laffan Port where both structures were constructed by Rosetti Marino at the N-Kom yard. On February 1

1 minutes read
  • LinkedIn
  • X
  • Email
Heerema’s Aegir Wraps Up Installation Work for Qatargas

Heerema’s Aegir vessel has finalized the installation of the 4.000 mT jacket and topside for Qatargas’ North Field Bravo Living Quarters Expansion project.

The Aegir firstly mobilized to Qatar’s Ras Laffan Port where both structures were constructed by Rosetti Marino at the N-Kom yard.

On February 14, the Aegir picked up the jacket horizontally from the quay side. The 1.000 mT structure was then sailed to the offshore site, upended, and positioned in a process that was first tested in Heerema’s simulation center.

In the subsequent days the main piles, consisting of a lead section and two ad-ons, were installed and driven to target penetration.

Following the pick up of the Qatar made topside, on February 23 the Aegir set sail to the construction site, where the deck was successfully installed.

The project was finalized on February 25, with both the jacket and topside installed.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago