Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Ørsted Setting Up Shop in Port Esbjerg
Ports & Logistics

March 5, 2020 · about 6 years ago

Ørsted Setting Up Shop in Port Esbjerg

Ørsted is building a new 3,000m2 central warehouse at a disused DFDS terminal in Port Esbjerg, Denmark. Slated for completion this summer, the facility will be used for main components for the wind turbine industry, such as gearboxes, generators, and transformers. ”We need more space for our operati

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Ørsted is building a new 3,000m2 central warehouse at a disused DFDS terminal in Port Esbjerg, Denmark.

Slated for completion this summer, the facility will be used for main components for the wind turbine industry, such as gearboxes, generators, and transformers.

”We need more space for our operations going forward, and Port Esbjerg was an obvious choice for us,” said Troels Klit Pedersen , Head of Operations Supply Chain at Ørsted, said.

”There’s lots of room and we’ll be in an area where we’ll not need special transport permits to go through the city. In addition, there are excellent opportunities to extend in the future.”

In addition to space, the port of Esbjerg also has the necessary quay facilities that Ørsted needs, the port said.

The fact that many jack-up vessels are based at the port of Esbjerg will be an advantage to Ørsted, when the heavy components are to be shipped and installed.

‟We need the jack-up vessels to install the components, and many of them sail directly out of the port of Esbjerg. This means that we can load the goods directly onto the vessels from the central warehouse,” said Pedersen.

The new warehouse will have two indoor gantry cranes with a lifting capacity of up to 40 tonnes each. Envia Ejendomme has been tasked with building the new central warehouse for Ørsted.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

18 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

18 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago