Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work
Offshore Wind

March 9, 2020 · about 6 years ago

Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work

Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone. Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation fo

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone.

Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation for the actual installation of the sea cables in July.

To remind, TenneT selected the Van Oord-Hellenic Cables consortium in September 2018 to connect the Hollandse Kust (South) Alpha and Beta offshore platforms to the Dutch onshore grid.

According to Van Oord, the Deep Dig-It trencher was specifically designed and built to the burry four cables more than 5m in the seabed for the first 10km of the offshore cable route, as to be able to cross the busy Rotterdam Maasmond shipping lane.

The TROV will be controlled from Van Oord’s offshore installation vessel MPI Adventure, which is equipped with a crane that launches and recovers the Deep Dig-It into the sea.

The trencher is more than 17m long, over 8m high, and has an installed power of 2,500 HP, making it possible to bury cables into very hard soils, the company said.

The Hollandse Kust (South) Alpha platform is expected to be completed in 2021 and Beta in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorageTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free