Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work
Storage

March 9, 2020 · about 6 years ago

Van Oord Testing New Trencher Ahead of Dutch Offshore Wind Work

Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone. Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation fo

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier

Van Oord is conducting final tests with its Deep Dig-It trencher before the installation of cables at the Hollandse Kust (South) offshore wind farm zone.

Van Oord is conducting final tests with the Tracked Remotely Operated Vehicle (TROV) in the Alexiahaven harbor, the Netherlands, in preparation for the actual installation of the sea cables in July.

To remind, TenneT selected the Van Oord-Hellenic Cables consortium in September 2018 to connect the Hollandse Kust (South) Alpha and Beta offshore platforms to the Dutch onshore grid.

According to Van Oord, the Deep Dig-It trencher was specifically designed and built to the burry four cables more than 5m in the seabed for the first 10km of the offshore cable route, as to be able to cross the busy Rotterdam Maasmond shipping lane.

The TROV will be controlled from Van Oord’s offshore installation vessel MPI Adventure, which is equipped with a crane that launches and recovers the Deep Dig-It into the sea.

The trencher is more than 17m long, over 8m high, and has an installed power of 2,500 HP, making it possible to bury cables into very hard soils, the company said.

The Hollandse Kust (South) Alpha platform is expected to be completed in 2021 and Beta in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

StorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago