Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Glavgosexpertiza grants Obsky LNG approval
News

March 11, 2020 · about 6 years ago

Glavgosexpertiza grants Obsky LNG approval

Russian regulatory body Glavgosexpertiza has reviewed and approved Novatek’s third liquefied natural gas project in the Arctic, named Obsky LNG.

2 minutes read
  • LinkedIn
  • X
  • Email
Glavgosexpertiza grants Obsky LNG approval

Russian regulatory body Glavgosexpertiza has reviewed and approved Novatek’s third liquefied natural gas project in the Arctic, named Obsky LNG.

The regulator noted that the facility to be located on the western shore of the Gulf of Ob on the Yamal Peninsula has a three-stage construction plan.

During the first stage, the reconstruction of the existing berths will take place, while the second stage will see the construction of a pier with a flyover from the liquefied natural gas plant and coastal infrastructure. In the third stage, the project includes works in the water area in the technological pier.

The planned handling capacity of the terminal is 5 million tons of liquefied natural gas per year.

The documents also show that the facility will be capable of handling at least 65 liquefied natural gas carriers annually.

In an interview with LNG World News in December last year, Novatek’s finance chief Mark Gyetvay said the project will have two trains with 2.5 mtpa production capacity each.

The plant will be based on a modified version of the Arctic Cascade technology which is currently being used to finalize the construction of Yamal LNG’s Train 4.

A final investment decision on the project is expected in the second half of 2020.

Novatek’s unit, Obsky LNG has already signed a EPC contract with a joint venture formed by two VINCI Construction unit, Entrepose Contracting and VINCI Construction Grands Projets for the construction of two full containment 160,000-cbm cryogenic LNG tanks.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago