Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›EnBW Seeks Monopile Installation and Dismantling Squad
Offshore Wind

March 20, 2020 · about 6 years ago

EnBW Seeks Monopile Installation and Dismantling Squad

EnBW HeDreiht GmbH is seeking a vessel and equipment for the installation and subsequent dismantling of up to two monopiles at the He Dreiht offshore wind farm zone in the German North Sea. The developer plans to carry out noise mitigation tests at the He Dreiht wind farm zone between 15 September a

1 minutes read
  • LinkedIn
  • X
  • Email
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
PPF; Source: ConocoPhillips

EnBW HeDreiht GmbH is seeking a vessel and equipment for the installation and subsequent dismantling of up to two monopiles at the He Dreiht offshore wind farm zone in the German North Sea.

The developer plans to carry out noise mitigation tests at the He Dreiht wind farm zone between 15 September and 31 October.

The tender is divided into two lots. Lot 1 covers the transport and installation of up to two monopiles in the period between 15 September and 31 October.

Lot 2 covers the dismantling of the monopile or the monopiles. The contract covers the period from 15 September 2020 and 31 December 2021.

He Dreiht is located within the German Exclusive Economic Zone (EEZ) of the North Sea, about 85 kilometres north of the island Borkum and 95 kilometres west of the island Helgoland.

In April 2017, EnBW secured rights to develop the 900MW project by placing a zero-subsidy bid in the first competitive tender in Germany. The wind farm is scheduled to be commissioned by 2025.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free