Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Beach Energy’s Australian offshore survey open for comment
News

March 24, 2020 · about 6 years ago

Beach Energy’s Australian offshore survey open for comment

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has invited public comments for Beach Energy’s proposed T/30P geophysical and geotechnical seabed survey.

2 minutes read
  • LinkedIn
  • X
  • Email
Beach Energy’s Australian offshore survey open for comment

Australia’s National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) has invited public comments for Beach Energy’s proposed T/30P geophysical and geotechnical seabed survey offshore Australia.

NOPSEMA said that Beach Energy’s seabed survey proposal was submitted last Thursday, March 19.

Under the proposal, Beach Energy’s subsidiary – Beach Energy Operations Limited – proposed to undertake a geophysical and geotechnical site survey over a portion of their T/30P permit and open acreage in the Otway Basin. At its closest point, the site survey is 76.5 kilometers from Port Campbell.

The site survey is required to inform the location of future drilling of an exploration well and identify potential hazards.

According to NOPSEMA, the data will be acquired from the same vessel in two parts. Namely, the geophysical survey to collect bathymetry data and detect hazards and a high-resolution two-dimensional shallow reflective imaging (2D survey) to inform shallow gas hazards.

The geotechnical survey, which may be undertaken from the same vessel as the geophysical and 2D survey or from a separate vessel, consists of coring, Piezo cone penetrometer test, and grab samples.

The site survey will take up to 28 days based on 21 days of survey time and 7 days for transits and setting up of equipment.

The site survey is proposed to be undertaken between April 1, 2020, and December 31, 2021. Timings of the survey are contingent on the availability of suitable vessels, weather, and the receipt of required environmental approvals. The survey will be undertaken with only one vessel undertaking each component at a time with the geophysical survey requiring seven days, the geotechnical survey needing six days, while the remaining eight days will be used for the 2D component.

The survey area refers is a 36 square kilometer area with an operational area of 100 square kilometers. The survey will be conducted in water depths across the operational area range from 150 – 1,110 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

€90M loan for Port of Rotterdam’s shore power development
News

€90M loan for Port of Rotterdam’s shore power development

about 4 months ago
QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports
News

QatarEnergy: Missile attacks spur $20 billion loss with drop in LNG exports

about 4 months ago