Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Siemens Gamesa freezes production at Hull factory
Offshore Wind

March 30, 2020 · about 6 years ago

Siemens Gamesa freezes production at Hull factory

Siemens Gamesa Renewable Energy has paused production at its blade factory at Alexandra Dock in Hull, UK, following the COVID-19 outbreak and subsequent governmental recommendations.

1 minutes read
  • LinkedIn
  • X
  • Email
Siemens Gamesa photo showing worker and blade in Hull factory
Siemens Gamesa/Archive

Siemens Gamesa Renewable Energy has paused production at its blade factory at Alexandra Dock in Hull, UK, following the COVID-19 outbreak and subsequent governmental recommendations.

“Siemens Gamesa Renewable Energy has been reviewing its operations daily in light of the Covid-19 outbreak and guidance coming from the government,” the company said in an email statement to OffshoreWIND.biz.

“While guidance regarding factories and industrial operations has been much less prescriptive than that for shops and offices, Siemens Gamesa is taking this opportunity to pause production operations and review safety measures in the light of new government guidelines. Port operations in Hull remain open under the same regime of review,” the company stated.

Siemens Gamesa opened the factory at Alexandra Dock in December 2016, when it officially unveiled the 75m long blade.

The company’s investment in the wind turbine assembly, rotor blade manufacturing factory and service facility in Hull is estimated to be around GBP 310 million (approximately EUR 346.4 million).

The first blades manufactured in the Hull factory were delivered for the Race Bank offshore wind farm in the summer of 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindTurbinesBusiness & FinanceSafety

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free