A hull for the Energean-owned Energean Power FPSO sailed away from the COSCO yard in China on Thursday, April 3, 2020.
The FPSO keel-laying took place at the COSCO Yard, Zhoushan, China, in April 2019 and in October 2019 the hull was undocked and floated out from COSCO Shipyard’s dry dock .
