Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›LNG›CCC scoops Arctic LNG 2 work
LNG

April 23, 2020 · about 6 years ago

CCC scoops Arctic LNG 2 work

Compressor Controls Corporation (CCC) secured multiple contracts for the Arctic LNG 2 project.

2 minutes read
  • LinkedIn
  • X
  • Email
CCC scoops Arctic LNG 2 work
Illustration purposes only (Image courtesy of Novatek)

Compressor Controls Corporation (CCC) secured multiple contracts for Novatek’s Arctic LNG 2 project.

CCC, a liquefied natural gas turbomachinery controls specialist, is a division of Roper Technologies. The company previously cooperated with Novatek on turbomachinery optimization and standardization for the Yamal LNG project.

The Arctic LNG 2 project boasts an expected production capacity of 19.8 million tons per year.

Under the contracts, CCC will oversee the turbomachinery controls and optimization of all three 6.6 mtpa LNG trains’ centrifugal compressors and expanders.

In addition, CCC will provide an emulator for use during the plant simulation and its eventual OTS.

The company will leverage specialized local and global teams. Additionally, it will collaborate with the OEMs, to execute and deliver the control algorithms.

The Arctic LNG 2 project includes constructing three LNG trains at 6.6 million tons per annum each. The trains will be built gravity-based structure (GBS) platforms. The project is based on the hydrocarbon resources of the Utrenneye field.

As of December 31, 2018, the Utrenneye field’s 2P reserves under PRMS totaled 1,138 billion cubic meters of natural gas and 57 million tons of liquids. Under the Russian classification, reserves totaled 1,978 billion cubic meters of natural gas and 105 million tons of liquids.

Project participants include NOVATEK (60 per cent), Total (10 per cent), CNPC (10 per cent), CNOOC Limited (10 per cent) and the Japan Arctic LNG, consortium of Mitsui & Co and JOGMEC (10 per cent).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

LNGBusiness Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free