Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GLDD Wraps up Phase II of the Post Florence Renourishment Project
Business & Finance

April 30, 2020 · about 6 years ago

GLDD Wraps up Phase II of the Post Florence Renourishment Project

Great Lakes Dredge & Dock has successfully completed Phase II of the Post Florence Renourishment Project. According to the Carteret County Shore Protection Office, GLDD’s hopper dredge Ellis Island delivered the last load of sand to West Emerald Isle (“reach 2”) at approximately 1:30 pm, on April 29

2 minutes read
  • LinkedIn
  • X
  • Email
GLDD Wraps up Phase II of the Post Florence Renourishment Project

Great Lakes Dredge & Dock has successfully completed Phase II of the Post Florence Renourishment Project.

According to the Carteret County Shore Protection Office, GLDD’s hopper dredge Ellis Island delivered the last load of sand to West Emerald Isle (“reach 2”) at approximately 1:30 pm, on April 29th signifying the conclusion of the beach nourishment phase of the project.

“ We will constrain the final numbers soon, but we likely placed in excess of 2 million cubic yards of sand total along the 9.5 miles of project beach in West Atlantic Beach (reach 10), Pine Knoll Shores (reach 9), Salter Path (reach 7), and West Emerald Isle (reach 2) ,” the Shore Protection Office said.

That’s roughly the equivalent of 166,700 dump trucks worth of sand, or enough sand to extend the footprint of a regulation NBA basketball court over 2 miles into the sky.

The office added that Great Lakes Dredge & Dock did a great job, and overcame challenges associated with internal and external COVID-19 precautions with 100% professionalism.

The demobilization process has already started and is in full swing – with Ellis Island departing the area.

The submerged pipeline near Sea Dunes Drive in West Emerald Isle should be floated and pulled this weekend. The land-based pipe are being staged on the beach at the “dog-leg” 4WD access in Emerald Isle and will be removed 5 to 6 at a time on large flatbed trailers – all equipment, pipe, etc. must be off the beach on May 7th, concluded the Shore Protection Office.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free