Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Norwegian Geotechnical Institute secures work on Hornsea Two offshore wind farm
Operations & Maintenance

May 5, 2020 · about 6 years ago

Norwegian Geotechnical Institute secures work on Hornsea Two offshore wind farm

The Norwegian Geotechnical Institute (NGI) has won a contract for a structural measurement campaign at Ørsted’s Hornsea Two offshore wind project in the UK. The scope of the contract includes the design, production and installation of instrumentation for six turbines for monitoring the monopile foun

1 minutes read
  • LinkedIn
  • X
  • Email
Norwegian-Geotechnical-Institute-Secures-Work-on-Hornsea-One-Offshore-Wind-Farm

The Norwegian Geotechnical Institute (NGI) has won a contract for a structural measurement campaign at Ørsted’s Hornsea Two offshore wind project in the UK.

The scope of the contract includes the design, production and installation of instrumentation for six turbines for monitoring the monopile foundation, transition piece and wind turbine generator tower.

The instrumentation systems supplied by NGI will provide data for structural health and response monitoring during the installation phase, initial and life-time operation.

According to NGI, the data will automatically be transmitted to shore at given intervals for further analysis.

Yard installations are planned to be completed later this year and final offshore commissioning is set for 2022.

“We are pleased that Ørsted has awarded this contract to NGI and our sub-suppliers, this is a contract won in sharp international competition,” said Kristoffer Skau , NGI’s Director for GeoData and Technology.

“We believe that NGI’s track record with Ørsted over many years, with delivery of complex instrumentation and monitoring systems to several of Ørsted’s offshore wind parks around the world has built confidence in our ability to deliver high quality operational solutions on time.”

Hornsea Two will comprise 165 Siemens Gamesa 8 MW turbines located 89km north-east of Grimsby.

The 1.4 GW offshore wind farm is scheduled to be commissioned in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

18 days ago