Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Jan De Nul selects Formosa 2 staging post
Ports & Logistics

May 11, 2020 · about 6 years ago

Jan De Nul selects Formosa 2 staging post

Jan De Nul will set up a logistics and operations hub for the 376 MW Formosa 2 offshore wind farm project in the Port of Taichung, Taiwan. Jan De Nul and a subsidiary of the Taiwan International Port Corporation (TIPC) signed a lease and operating agreement covering a total of around 15 hectares of

2 minutes read
  • LinkedIn
  • X
  • Email
Jan De Nul selects Formosa 2 staging post

Jan De Nul will set up a logistics and operations hub for the 376 MW Formosa 2 offshore wind farm project in the Port of Taichung, Taiwan.

Jan De Nul and a subsidiary of the Taiwan International Port Corporation (TIPC) signed a lease and operating agreement covering a total of around 15 hectares of land.

The area will be used for the handling, assembly, and storage of underwater support elements, and as a staging base for the upcoming work on underwater support structures at Formosa 2.

Jan De Nul is the EPCI contractor for the project’s foundations and subsea cables.

Located between four and ten nautical miles off Miaoli County, Formosa 2 will comprise 47 Siemens Gamesa 8 MW turbines installed on jacket foundations in water depths of up to 55 metres. The wind farm is expected to be commissioned in 2021.

Jan De Nul selected Saipem and Sembcorp to deliver the pile jacket foundations for the wind farm. The pin piles will be fabricated by EEW SPC.

All of the jacket components will be manufactured in Asia. The jacket foundations will be installed by Seaway 7.

The subsea cables will be manufactured and delivered by South Korea’s LS Cable.

The Formosa 2 wind farm is being developed by a partnership between JERA, Macquarie’s Green Investment Group, and Swancor Renewable Energy.

Jan De Nul previously utilised the Port of Taichung as the base of operations for the Formosa 1 project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

18 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

18 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago