Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Final WindFloat Atlantic turbine ready to go home
Offshore Wind

May 19, 2020 · about 6 years ago

Final WindFloat Atlantic turbine ready to go home

The last of the three floating wind turbines for the WindFloat Atlantic project will soon set sail from Spain to its designated location off Portugal. Tractebel Engie reported on 17 May that it fully assembled the third WindFloat Atlantic platform in the port of Ferrol. The turbine should start its

2 minutes read
  • LinkedIn
  • X
  • Email
Third WindFloat Atlantic turbine being towed to site
Tractebel Engie

The last of the three floating wind turbines for the WindFloat Atlantic project will soon set sail from Spain to its designated location off Portugal.

Tractebel Engie reported on 17 May that it fully assembled the third WindFloat Atlantic platform in the port of Ferrol.

The turbine should start its journey to the site off the coast of Viana do Castelo later this month. There, it will join the two units that are already in place.

The first WindFloat Atlantic turbine was installed in October 2019 and the second one arrived at the site in January 2020. The project’s first turbine was connected to the grid on 31 December 2019 and began generating power immediately after that.

The three floating structures will form the first floating wind farm in continental Europe. (To remind, Europe’s first floating wind farm is in Scotland.)

Comprising MHI Vestas 8.4 MW turbines on Principle Power’s semi-submersible foundations, WindFloat Atlantic also marks the installation of the largest wind turbines ever on floating structures.

Once operational, the 25 MW floating wind farm will be able to produce enough electricity to supply the equivalent of 60,000 users each year.

The Kincardine project off Scotland is also featuring the WindFloat platform. The first 2 MW turbine at the Scottish project site became operational in 2018. The five additional 9.5 MW turbines are under fabrication and will start operations in 2020.

In France, WindFloat floating wind turbines will make up the 30 MW Golfe du Lion project. There, the semi-submersible structures will hold 10 MW turbines. The Golfe du Lion wind farm will be fully operational by 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindWind FarmsBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free