Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Italy: Application submitted for 330 MW offshore wind farm in Adriatic Sea
Business Developments & Projects

June 8, 2020 · about 6 years ago

Italy: Application submitted for 330 MW offshore wind farm in Adriatic Sea

Energia Wind 2020 srl, part of the Italian energy company 3R Energia srl, has submitted an application to the Italian government for a 30-year concession of an area in Italy’s sector of the Adriatic Sea, where it plans to build a 330 MW offshore wind farm. The application outlines a site some off th

2 minutes read
  • LinkedIn
  • X
  • Email
A map showing the locations of all the offshore wind farm's infrastructure

Energia Wind 2020 srl, part of the Italian energy company 3R Energia srl, has submitted an application to the Italian government for a 30-year concession of an area in Italy’s sector of the Adriatic Sea, where it plans to build a 330 MW offshore wind farm.

The application outlines a site some off the coasts of Rimini, Riccione, Misano Adriatico and Cattolica municipalities, in the stretch of sea pertaining to the Port Authority of Rimini.

The project, dubbed Rimini, would consist of 59 wind turbines of a 5 MW class, with 58 of them having a nominal output of 5.6 MW and one having an output of 5.2 MW.

The wind turbines would be supported by monopile foundations of some 4.8 metres in diameter, installed in water depths of up to 35 meters.

Furthermore, the project would feature two circular offshore substations with a diameter of 40 metres each, and 20 kilometres of subsea electric cables which would connect the wind turbines and group them into two main sections of 151.2 MW and 178.8 MW to be hooked to the offshore substations.

The Rimini offshore wind farm would then be connected to land with two export cables from the substations coming together into a single route around ten kilometres from the coast.

Once the export cable reaches the mainland, it would cross the beach for about 160 metres to be connected to the onshore electrical infrastructure, most likely in Bellariva di Rimini.

The application was filed on 30 March to the Italian Ministry of Infrastructure and Transport.

On 4 June, the ministry and the Port Authority of Rimini put the project plans for public consultation that will run until 4 July. Stakeholder feedback has been invited for observations or oppositions regarding the use of sea (traffic, navigation, fishing, etc.).

The environmental impact assessment of the final project will take place in a subsequent phase, in which the stakeholders’ input will again be invited in these terms.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago