Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Grid›Second Triton Knoll topside ready to move
Grid

June 10, 2020 · about 6 years ago

Second Triton Knoll topside ready to move

The second Triton Knoll offshore substation platform (OSP) topside has been loaded onto a barge and fastened in Vlissingen, the Netherlands. The Triton Knoll OSP East topside was seafastened onto the Greenbarge 3 at Damen Shiprepair Vlissingen. The Greenbarge 3 and the topside will be towed offshore

1 minutes read
  • LinkedIn
  • X
  • Email
Second Triton Knoll topside ready to move
Damen Shiprepair & Conversion

The second Triton Knoll offshore substation platform (OSP) topside has been loaded onto a barge and fastened in Vlissingen, the Netherlands.

The Triton Knoll OSP East topside was seafastened onto the Greenbarge 3 at Damen Shiprepair Vlissingen.

The Greenbarge 3 and the topside will be towed offshore the UK to be installed on the accompanying monopile foundation at the 857 MW wind farm.

The wind farm’s first offshore substation, the OSP West, was installed at the site some 32 kilometres off Lincolnshire by Seaway Strashnov mid-April.

Siemens Energy designed the OSPs and Smulders, in partnership with ENGIE Fabricom, built the topsides and the specialised monopile foundations.

The two OSPs will receive electricity generated by the wind farm’s 90 MHI Vestas v164-9.5 MW turbines and convert it for transfer to the landfall connection. The export cables are expected to be installed this summer.

Developed by innogy, Triton Knoll is scheduled to be commissioned in 2021. Offshore construction is well underway, with the first turbine foundation installed in January.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

GridOffshore WindPorts & LogisticsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free