Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Italy’s 1st small-scale LNG terminal nearing completion
Business Developments & Projects

June 15, 2020 · about 6 years ago

Italy’s 1st small-scale LNG terminal nearing completion

Italy is to get its first small-scale liquefied natural gas facility as construction works progress on the Higas terminal located on the island of Sardinia. The small-scale storage, regasification and distribution facility will be ready “in a few months”, according to Gas & Heat, the Italian enginee

2 minutes read
  • LinkedIn
  • X
  • Email
Higas LNG terminal

Italy is to get its first small-scale liquefied natural gas facility as construction works progress on the Higas terminal located on the island of Sardinia.

The small-scale storage, regasification and distribution facility will be ready “in a few months”, according to Gas & Heat, the Italian engineering company that is the EPC contractor for the project.

London-based Avenir LNG, a joint venture consisting of Stolt-Nielsen, Hoegh LNG and Golar LNG, owns Higas with a 80 per cent stake while its local partners Gas & Heat and CPL Concordia hold 10 per cent share, each.

Higas started building the facility in the Port of Oristano in Sardinia back in 2018 and previously expected to launch the terminal in the second half of 2019.

The project operator expects the terminal to be full operational by the end of this year.

The terminal will have a dedicated 7,500-cbm Avenir LNG carrier.

It will be able to receive LNG from small and medium-sized carriers, to discharge the fuel into the storage tanks mainly for use in liquid form as fuel for automotive, industrial, civil and marine industries.

The facility features six horizontal low-pressure cryogenic tanks, and will have a capacity to load up to 8,000 LNG trucks per year – equivalent to 180,000 tons per year – via two loading bays.

Furthermore, the terminal will also have a connection to a natural gas pipeline system that will allow the fuel to be distributed to local industry.

Avenir LNG expects the total costs of the small-scale facility to be $43.2 million.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago