Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Ramboll bags contracts for German N-3, O-1 offshore wind farm areas
Offshore Wind

June 22, 2020 · about 6 years ago

Ramboll bags contracts for German N-3, O-1 offshore wind farm areas

Ramboll will provide geological modelling and reporting for N-3 and O-1 offshore wind areas in the German sectors of the North and Baltic Seas, respectively. The total value of the contracts for the two areas is around EUR 514,000. The work will be done as part of the geological preliminary investi

2 minutes read
  • LinkedIn
  • X
  • Email
Location of the new wind areas in the North and Baltic Seas
BSH

Ramboll will provide geological modelling and reporting for N-3 and O-1 offshore wind areas in the German sectors of the North and Baltic Seas, respectively.

The total value of the contracts for the two areas is around EUR 514,000.

The work will be done as part of the geological preliminary investigation, with and overarching goal being the creation of geological models and reports for the provision to third parties.

Under the contract(s), Ramboll will transfer hydroacoustic and seismic data, taking geotechnical information into account, into a 3-dimensional engineering geological depth model and prepare geological reports for the specific sites within the two areas.

The final geological reports will combine the hydrographic, geophysical, and geotechnical work, as well as the documentation of the geological models and their engineering-geological interpretation with regard to the construction of wind turbines and the associated offshore infrastructure.

For the N-3 area in the North Sea, Ramboll will conduct modelling and reporting for the N-3.5, N-3.6, N-3.8 sites and, separately, for N-3.7. For the O-1 area in the Baltic Sea, the work will be carried out for the O-1.3 site.

Germany’s Federal Maritime and Hydrographic Agency (Bundesamt für Seeschifffahrt und Hydrographie; BSH) issued a call for tenders for these services in mid-March with a close date on 30 March, which was later prolonged until 7 April.

The work under the contracts was initially scheduled to be carried out between 1 May and 15 November 2020, with the starting date later moved to 1 June.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindWind FarmsBusiness Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free