Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›RVO teases IJmuiden Ver ground model tender
Business Developments & Projects

June 26, 2020 · about 6 years ago

RVO teases IJmuiden Ver ground model tender

The Netherlands Enterprise Agency (RVO) plans to issue a tender for the development of an integrated ground model for the 4 GW IJmuiden Ver wind farm zone in July. This integrated ground model should be of sufficient accuracy to allow (preliminary) foundation design, RVO said. The deliverables of th

2 minutes read
  • LinkedIn
  • X
  • Email
RVO teases IJmuiden Ver ground model tender

The Netherlands Enterprise Agency (RVO) plans to issue a tender for the development of an integrated ground model for the 4 GW IJmuiden Ver wind farm zone in July.

This integrated ground model should be of sufficient accuracy to allow (preliminary) foundation design, RVO said.

The deliverables of this assignment will be made available to the participants in the concession tenders for the IJmuiden Ver offshore wind farm zone at the latest in the fourth quarter of 2022.

The development of an integrated ground model of the Hollandse Kust (noord) wind farm zone will be the reference for the Scope of Work, with some possible innovations.

The integrated ground model will be made based on the results of the geophysical work that is currently ongoing in the IJmuiden Ver zone.

The model will then be used as input for the geotechnical campaign which will validate the geological model resulting from the geophysical investigation and to confirm the soil engineering properties required by developers to progress with their geotechnical foundation designs and other general design and installation requirements for the wind farm, as well as those relating to cable installation.

Located some 62 kilometres off the west coast of the Netherlands, the 400km2 Ijmuiden Ver zone is divided into four sites – IJmuiden Ver I,II, III, and IV.

The Dutch government will issue two tenders for the permits to develop the sites, in 2023 for IJmuiden Ver I and II, and in 2025 for IJmuiden Ver III and IV.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago