Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Foundations›Watch: Samkang sends off TPC jackets
Foundations

June 29, 2020 · about 6 years ago

Watch: Samkang sends off TPC jackets

Following the first load-out of the jacket foundations built by Samkang for the TPC Phase 1 wind farm in Taiwan, the South Korean manufacturer has now shared a video showing the process. Back in May, Jan De Nul completed the load-out of the first four of the 21 jacket foundations built for the 109.2

1 minutes read
  • LinkedIn
  • X
  • Email
Samkang
Samkang/Screenshot

Following the first load-out of the jacket foundations built by Samkang for the TPC Phase 1 wind farm in Taiwan, the South Korean manufacturer has now shared a video showing the process.

Back in May, Jan De Nul completed the load-out of the first four of the 21 jacket foundations built for the 109.2 MW TPC (Taiwan Power Company) TPC Offshore Windfarm Phase 1 at Samkang’s yard.

The four-legged jackets are being shipped in five batches of three to five units on a self-propelled semi-submersible transport vessel. Jan De Nul tapped Taiwan’s Hung Hua for the transport of the jackets.

The jackets measure between 55 and 62 metres in overall length. The heaviest unit weighs approximately 1,100 tonnes, and the combined total weight is approximately 22,000 tonnes.

Each jacket includes a 7.2-metre transition piece (TP) with a diameter of 5.4 metres to support towers carrying the Hitachi 5.2 MW turbines.

Once in Taiwan, the jackets will be custom cleared before travelling to their final destination approximately 8 kilometres off the coast of Fangyuan in Central Western Taiwan, where Jan De Nul is responsible for their installation.

The wind farm is scheduled to be operational by the end of the year.

The video of the load-out of the jacket foundations can be accessed here .

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FoundationsOffshore WindWind FarmsHeavy liftingPorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free