Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Export cables installed at CTGNE Yangjiang Shapa Phase 1 offshore wind project
Project & Tenders

July 17, 2020 · about 6 years ago

Export cables installed at CTGNE Yangjiang Shapa Phase 1 offshore wind project

Ningbo Orient Cable (NBO) has completed the installation of the export cable at the China Three Gorges New Energy (CTGNE) Yangjiang Shapa Phase 1 offshore wind project. According to NBO, the installation of two 220kV export cables was finished after 14 months and now the offshore engineering team is

1 minutes read
  • LinkedIn
  • X
  • Email
Export-Cables-Installed-at-CTGNE-Yangjiang-Shapa-Phase-1

Ningbo Orient Cable (NBO) has completed the installation of the export cable at the China Three Gorges New Energy (CTGNE) Yangjiang Shapa Phase 1 offshore wind project.

According to NBO, the installation of two 220kV export cables was finished after 14 months and now the offshore engineering team is installing the 35kV inter-array cables.

Seven circuits have been completed and the rest is expected to be done before the end of this year.

CTGNE Yangjiang Shapa Phase 1 comprises 55 5.5 MW turbines and is Three Gorges Group’s first wind project off the Guangdong Province.

The 300 MW wind farm, also known as Yangxi Shapa Phase 1, produced first power in November 2019.

It is part of a larger offshore wind project which once fully commissioned will have an installed capacity of over 1 GW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free