Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Fugro starts geophysical survey for East Anglia Hub
Operations & Maintenance

July 28, 2020 · about 6 years ago

Fugro starts geophysical survey for East Anglia Hub

Fugro has began the geophysical survey phase of a multidisciplinary site investigation contract worth around GBP 55 million for ScottishPower Renewables’ (SPR’s) East Anglia Hub project. The phased site investigations are scheduled to finish at the end of 2021 and support the development of wind far

2 minutes read
  • LinkedIn
  • X
  • Email
Fugro starts geophysical survey for East Anglia Hub

Fugro has began the geophysical survey phase of a multidisciplinary site investigation contract worth around GBP 55 million for ScottishPower Renewables’ (SPR’s) East Anglia Hub project.

The phased site investigations are scheduled to finish at the end of 2021 and support the development of wind farms in the UK southern North Sea over an area of more than 800 km2.

The results from Fugro’s site characterisation will feed into SPR’s ground models for the East Anglia Hub and support seabed mobility assessment, foundation design and cable-route engineering.

Operating from dedicated geophysical survey vessels, the Fugro team began the UXO surveys in July; full coverage bathymetric surveys and sub-bottom profiler surveys across the site and export cable routes will follow. Data processing and reporting will be completed in Fugro’s UK and Netherlands offices.

Geotechnical investigation of the wind turbine locations will start later this summer and will comprise ultra-deep seabed cone penetration tests (CPTs) using Fugro’s SEACALF Mk V DeepDrive CPT system, downhole and seismic CPTs, geotechnical sampling, and geophysical borehole logging.

Shallow geotechnical testing and sampling will be performed along the export cable routes, while standard and advanced soil testing will take place at Fugro’s soil laboratory testing facility in Wallingford, UK.

Richard Hill , Fugro’s proposal manager for the project, said: “This is a significant and exciting project for Fugro that will see us deploying multiple geophysical and geotechnical vessels from our fleet to the East Anglia Hub for the next 2 years. Fugro’s innovative technologies, experienced geophysical and geotechnical survey teams, and large capacity for advanced soil testing laboratory in the UK will be crucial in helping SPR to meet their project timescales.”

SPR’s East Anglia Hub will eventually consist of 263 wind turbine generators capable of delivering a total installed capacity of up to 3.1 GW, enough to power up to 2.7 million homes.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago