Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›GALLERY: Lukoil installs jackets for ice-resistant platform in Caspian Sea
Fossil Energy

September 15, 2020 · about 6 years ago

GALLERY: Lukoil installs jackets for ice-resistant platform in Caspian Sea

Russia’s Lukoil has completed the installation of the jackets of the fixed ice-resistant platform at the V.I. Grayfer field in the Caspian Sea.

2 minutes read
  • LinkedIn
  • X
  • Email
Lukoil
Source: Lukoil

Russia’s Lukoil has completed the installation of the jackets of the fixed ice-resistant platform at the V.I. Grayfer field in the Caspian Sea.

Before shipping to the sea, more than 3,700 tonnes heavy jackets were moved up to the cargo pontoon Rahman Sharifov and floated off.

The offshore operations involved over three hundred workers, Lukoil said in a statement on Tuesday.

The fleet navigated to the offshore installation site via the Volga-Caspian seaway canal for five days.

Lukoil started construction of the platform jackets in August of 2018.

According to Lukoil, a shipyard in Astrakhan that built and assembled the structure applied a special Russian technology of hull metallization which guarantees the long-lasting operation of the substructure and prevents corrosion in the North Caspian environment.

The company plans to mount topsides of the accommodation block and the ice-resistant platform on the jackets in 2021.

The jacket for the accommodation platform was installed in May 2020 .

Related Articles

Fossil Energy

Lukoil installs living quarters jacket at Caspian Sea field

2 min read

The start of production at the field is scheduled for 2022. The field’s annual planned production rate is 1.2 million metric tonnes of oil.

The field was named after its recently deceased chairman and “founding father” of the Soviet oil industry Valery Isaakovich Grayfer .

Lukoil also in June started drilling an exploration well at the Shirotno-Rakushechnaya prospect located north of the V.I. Grayfer field.

The well, with the target depth of 1,650 meters, was drilled from the Astra jack-up drilling rig. The rig is designed for shallow waters and the sea at the point of the well is 4.5 meters deep.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasSubseaBusiness & FinanceBusiness Developments & ProjectsExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free