Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Construction on Dutch offshore wind farm enters final stretch
Project & Tenders

September 18, 2020 · about 6 years ago

Construction on Dutch offshore wind farm enters final stretch

Around three-quarters of wind turbines have been installed at the 731.5 MW Borssele III and IV wind farm off the Netherlands, MHI Vestas said. The first of the wind farm’s 77 MHI Vestas 9.5 MW turbines was installed at the site some 55 kilometres off Vlissingen at the end of May. Van Oord’s installa

1 minutes read
  • LinkedIn
  • X
  • Email
Construction on Dutch offshore wind farm enters final stretch

Around three-quarters of wind turbines have been installed at the 731.5 MW Borssele III and IV wind farm off the Netherlands, MHI Vestas said.

The first of the wind farm’s 77 MHI Vestas 9.5 MW turbines was installed at the site some 55 kilometres off Vlissingen at the end of May.

Van Oord’s installation vessel Aeolus is loading the units at the port of Vlissingen and installing them at the 146-square-kilometre site.

The wind farm is expected to be completed this year and fully commissioned in 2021.

The Borssele III and IV wind farm is owned and developed by the Blauwwind consortium.

The consortium comprises Partners Group (45%), Shell (20%), DGE (15%), Eneco Group (10%), and Van Oord (10%), with the latter also being the Balance of Plant (BoP) contractor.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free