Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Petrobras completes Guanabara Bay LNG record flowrate test
Business Developments & Projects

September 18, 2020 · about 5 years ago

Petrobras completes Guanabara Bay LNG record flowrate test

Brazilian oil and gas major Petrobras claimed a new world record for regasification with a floating storage and regasification unit (FSRU).

2 minutes read
  • LinkedIn
  • X
  • Email
Petrobras completes Guanabara Bay LNG record flowrate test

Brazilian oil and gas major Petrobras claimed a new world record for regasification with an FSRU.

The company said it has completed the operation test with a flowrate of 30 million cubic meters per day of natural gas at the Guanabara Bay liquefied natural gas regasification terminal in Rio de Janeiro.

Petrobras said all phases of the test have been accompanied by a certifying company. This was done in order to certify the facility’s ability to operate under the new proposed conditions.

This is one of the requirements of the authorization process for the expansion of Guanabara Bay LNG terminal. Its operational capacity will rise from 20 to 30 million cubic meters per day.

State Environmental Institute (INEA – Instituto Estadual do Ambiente) and the National Petroleum, Natural Gas and Biofuels Agency (ANP) are surveying the process.

The terminal consists of an island type pier with two berths for an FSRU vessel and a supply vessel.

Currently, the facility has a maximum regasification capacity is 20 million cubic meters per day of natural gas. It is currently in a process of obtaining new licenses and permits to expand the capacity to 30 mcm/d.

The terminal’s integrated gas pipeline is 15 km long, 10 km underwater and 5 km on land. It is also 28 inches in diameter. It connects the facility to the Campos Elíseos reception station, where the interconnection with the integrated network of transportation pipelines takes place.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago