Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Vessels›SOV for Hornsea Two OWF launched in Turkey
Vessels

September 21, 2020 · about 6 years ago

SOV for Hornsea Two OWF launched in Turkey

Louis Dreyfus Armateurs’ (LDA’s) new service operations vessel (SOV), which will be working at Ørsted’s Hornsea Two offshore wind farm, was launched on 21 September at Cemre Shipyard in Turkey. The Wind of Hope SOV, ordered in 2018, is expected to arrive at Ørsted’s operations and maintenance (O&M)

2 minutes read
  • LinkedIn
  • X
  • Email
The Wind of Hope SOV at Cemre shipyard in Turkey during launching ceremony

Louis Dreyfus Armateurs’ (LDA’s) new service operations vessel (SOV), which will be working at Ørsted’s Hornsea Two offshore wind farm, was launched on 21 September at Cemre Shipyard in Turkey .

The Wind of Hope SOV, ordered in 2018, is expected to arrive at Ørsted’s operations and maintenance (O&M) facility at the port of Grimsby in the UK next year.

The vessel will serve as an accommodation and working base for wind turbine technicians who will spend two weeks at a time at Hornsea Two.

The 84-metre SOV, which can accommodate up to 64 wind turbine technicians and a vessel crew, has a diesel-electric propulsion and DP2 capabilities. It has been fitted out with a motion compensated gangway and an onboard helideck for crew and cargo transfers.

“The Wind of Hope has been designed with comfort and practicality in mind and we look forward to welcoming her to her new home in Grimsby”, said Morten Holm , Head of Operations for Hornsea Two at Ørsted.

This is the second SOV that the offshore wind developer chartered from LDA.

In 2018, the vessel owner launched the Wind of Change SOV, a 83-metre long vessel used for O&M work at Ørsted’s Borkum Riffgrund 1 & 2 and Gode Wind 1 & 2 offshore wind farms in Germany.

Wind of Change , also built by Cemre Shipyard in Turkey, started operating at the German offshore wind farms in 2019.

Both vessels have been designed by Salt Ship Design.

Ørsted’s 1.4 GW Hornsea Two project will comprise 165 Siemens Gamesa 8 MW turbines and is scheduled to be commissioned in 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free