Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Equinor closes Hammerfest LNG after fire
Business & Finance

September 29, 2020 · about 5 years ago

Equinor closes Hammerfest LNG after fire

Norwegian energy giant Equinor has shut down its Hammerfest LNG export plant following a fire in an oil-powered turbine at the facility. Equinor said the incident occurred on Monday at about 15:30h local time with no injuries reported. Images on local media showed smoke rising from the plant but Equ

2 minutes read
  • LinkedIn
  • X
  • Email
Equinor closes Hammerfest LNG after fire

Norwegian energy giant Equinor has shut down its Hammerfest LNG export plant following a fire in an oil-powered turbine at the facility.

Equinor said the incident occurred on Monday at about 15:30h local time with no injuries reported.

Images on local media showed smoke rising from the plant but Equnior said later in the day that the fire was put out with work ongoing to cool down the stricken area.

Furthermore, the Norwegian firm said it evacuated all non-emergency staff from the facility notifying relevant authorities on the incident.

It remains unclear when Equinor would bring back online the facility.

This incident occured just hours after Equinor restarted the facility following an outage and a gas leak.

The operator shut down the plant on September 11 and tried to bring it back online two days later but closed it again following a gas leak.

The Norwegian firm restarted the plant early on September 28 and it worked just for hours prior to the fire.

The closure of the terminal which liquefies natural gas from the Snohvit (Snow White) field in the Barents Sea reduced production by 18 million cubic metres per day.

Natural gas from Snohvit reaches Hammerfest LNG via a 160-kilometer gas pipeline which became operational in the autumn of 2007.

Hammerfest LNG is able to produce about 4.3 million tonnes per year of LNG.

The fuel produced at the facility mainly lands at LNG terminals in Europe but also in Asia.

Equinor is the operator of both the Snohvit field and Hammerfest LNG with a 36.8 percent stake.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago