Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Jadestone files environment plan for new offtake model at Stag field
Authorities & Government

September 30, 2020 · about 5 years ago

Jadestone files environment plan for new offtake model at Stag field

Jadestone Energy has filed a revision of its environment plan for operations at the Stag field, located offshore Australia, to the Australian authorities.

2 minutes read
  • LinkedIn
  • X
  • Email
Aerial view of Stag Facility - Jadestone

Jadestone Energy has filed a revision of its environment plan for operations at the Stag field, located offshore Australia, to the Australian authorities.

The Australian petroleum regulator, NOPSEMA, said on Wednesday that Jadestone’s Stag environment plan is now under assessment.

Jadestone is the operator and titleholder of the Stag Field Production and Export Facility located in permit area WA‐15‐L, approximately 60 km northwest of Dampier.

The facility, located in approximately 49 m water depth, produces oil from the Stag reservoir.

Oil is loaded continuously to the third-party tanker at a production rate of up to 4,000 bbl/d. The CPF has been in production since 1998 with only minor modifications carried out during this time.

Historical operations at the Stag field have seen the inclusion of a floating, storage and offtake (FSO) vessel – Dampier Spirit – that has been moored in the field and receives produced oil from the central production facility (CPF), and then offtake of the cargo to a third-party tanker.

Recent operational and commercial developments have seen a shift to an operating model that requires only a third-party tanker and thereby permanent relinquishment of the FSO from the field, and therefore a revision to the current EP has been submitted.

Namely, the owner of the Dampier Spirit Altera Infrastructure, formerly Teekay, advised Jadestone of its intention to retire the Dampier Spirit later in 2020.

As a consequence, Jadestone has developed a new operating strategy, utilising offtake tankers to directly offload Stag crude oil, in place of the existing long-term leased FSO.

The scope of this Environment Plan covers the operation of the offshore facilities for a period of up to five years from initial acceptance in December 2017.

Activities associated with the facility include: a fixed Central Production Facility (CPF), producing and processing oil from a number of wells; a single 2 km long carbon steel export oil pipeline on the northeast side of the CPF connecting to a Catenary Anchor Leg Mooring (CALM) buoy via a flexible submarine hose; a third-party tanker receives oil through a flexible import hose from the CALM buoy. Once loading is complete, the tanker departs the field for delivery of cargo to market. No offtake activity from the third party tanker occurs in field.

Activities also include water injection flowlines and wells to assist reservoir fluid recovery; support/ supply vessels, work vessels and tug boats/ static tow vessels supporting third-party tanker movement, facility logistics, maintenance and provisioning; and helicopter support.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentBusiness & FinanceBusiness Developments & ProjectsEnvironmentExploration & ProductionRegulation & PolicyRules & RegulationVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago