Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›EolMed floating wind project to feature MHI Vestas 10 MW turbines
Business Developments & Projects

October 5, 2020 · about 5 years ago

EolMed floating wind project to feature MHI Vestas 10 MW turbines

Qair, formerly known as Quadran Énergies Marines, has signed a preferred supplier agreement with MHI Vestas for three 10 MW offshore wind turbines for the EolMed floating wind pilot project in France. This will be the second floating wind project in which the company’s V164 turbine’s nominal capacit

2 minutes read
  • LinkedIn
  • X
  • Email
An image rendering an MHI Vestas wind turbine on a floating foundation at EolMed site at sea, with a Qair logo on nacelle

Qair, formerly known as Quadran Énergies Marines, has signed a preferred supplier agreement with MHI Vestas for three 10 MW offshore wind turbines for the EolMed floating wind pilot project in France.

This will be the second floating wind project in which the company’s V164 turbine’s nominal capacity is brought to 10 MW, following Eoliennes Flottantes du Golfe du Lion (EFGL) for which the MHI Vestas 10 MW model was selected last year.

The three V164-10.0 MW turbines for the 30 MW EolMed project will be installed on Ideol’s Damping Pool floating foundation at a site in the Mediterranean Sea some 18 kilometres off the coast of Gruissan in the Aude region.

EolMed is scheduled to be built in 2023.

“The combination of proven technologies such as Ideol’s patented Damping Pool foundation and MHI Vestas’ V164-10.0 MW turbine can potentially enable a quicker route to market for floating wind projects in Europe and Asia, where MHI Vestas deploys strong operational presences” , MHI Vestas states in a press release from 5 October.

EolMed is the third floating offshore wind project for MHI Vestas in France and the sixth floating project overall.

The wind turbine supplier has also been chosen for the Groix & Belle Ile floating wind farm, for which it will deliver three of its V164-9.5 MW wind turbines.

EFGL and Groix & Belle Ile projects in France are expected to be built in 2022 and 2023, respectively.

Outside France, two more floating wind farms will comprise MHI Vestas wind turbines: Windfloat Atlantic in Portugal and Kincardine in Scotland.

The now decommissioned WindFloat 1 project in Portugal was also featuring an MHI Vestas turbine.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago