Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›WSP to re-design Vineyard Wind wind turbine foundations
Business Developments & Projects

October 6, 2020 · about 5 years ago

WSP to re-design Vineyard Wind wind turbine foundations

WSP USA will carry out a re-design of the wind turbine foundations for the Vineyard Wind offshore wind farm in Massachusetts. Following recent permitting changes, Vineyard Wind modified the turbine layout and the U.S.-based engineering consultancy will now work on the re-design, after having provide

2 minutes read
  • LinkedIn
  • X
  • Email
An image showing Vineyard Wind offshore site

WSP USA will carry out a re-design of the wind turbine foundations for the Vineyard Wind offshore wind farm in Massachusetts.

Following recent permitting changes, Vineyard Wind modified the turbine layout and the U.S.-based engineering consultancy will now work on the re-design, after having provided the foundation design services prior to the changes to the project.

The scope includes design of the primary steel, secondary steel and electrical components for the monopiles and transition pieces.

In a press release from 5 October, WSP said it would deliver a cost-effective design solution for the project together with its subcontractor partners Wood Thilsted, a specialist structural and geotechnical engineering consultancy, and C2Wind, an offshore wind power design consultancy.

The 800 MW Vineyard Wind will feature MHI Vestas 9.5 MW turbines, installed some 22.5 kilometres south of Martha’s Vineyard and 56 kilometres off the coast of the Massachusetts mainland.

After the draft Environmental Impact Statement (EIS) for the Vineyard Wind project was published, and in response to stakeholder feedback, the developer and other Rhode Island and Massachusetts offshore wind leaseholders committed to implementing grid layout with a spacing of one nautical mile (1 NM) between the wind turbines.

In June, the U.S. Bureau of Ocean Energy Management (BOEM) issued a Supplement to the Draft Environmental Impact Statement (SEIS) for Vineyard Wind, which also contains some new alternatives for the wind farm layout that propose a wider transit lane, either a 2 NM or a 4 NM one. These options would require relocating more wind turbines compared to the initial layout proposal, than the 1×1 NM array.

Following the SEIS release, the industry voiced its opposition to the new layout alternatives, saying that the 1×1 NM layout, agreed to by all New England offshore wind leaseholders, provides ample and uniform navigation transit lanes, and that this was larger spacing than in any other wind facility currently operating in the world. The 1×1 NM grid layout has also been determined by the U.S. Coast Guard as the one to “maximize safe navigation”, the industry pointed out.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & Projects

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

16 days ago