Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tulip Oil halves gas production from North Sea field
Business & Finance

October 14, 2020 · about 5 years ago

Tulip Oil halves gas production from North Sea field

Tulip Oil halved its gas production from the Q10-A field in the Dutch North Sea in the third quarter of the year when compared to the previous quarter.

2 minutes read
  • LinkedIn
  • X
  • Email
Q10-A platform - Tulip Oil

Dutch exploration and production operator Tulip Oil halved its gas production from the Q10-A field in the Dutch North Sea during the third quarter of the year when compared to the previous quarter due to a temporary shut-in and lower prices.

The Tulip Oil-operated Q10-A field started producing gas in February 2019.

Due to the low gas prices, Tulip Oil in July 2020 said it had partially reduced the production from the Q10-A field to “leave gas in the ground”.

As a result, 119 million standard cubic meters of gas were produced during the second quarter of the year compared to 198 million standard cubic meters of gas in the first quarter of 2020.

In an update on Wednesday, Tulip Oil said that, since 1 September, the production was shut in entirely to allow for planned maintenance of the neighbouring P15 platform.

As such, 59 million standard cubic meters of gas were produced in 3Q, compared with 119 million standard cubic meters in 2Q.

The average realized gas price was 6.1 €/MWh during 3Q compared with 5.6 €/MWh in the previous quarter.

At the reduced production levels, the Q10-A field continues to generate strong EBITDA margins, the company said.

Steps have been taken to increase production capacity in 4Q by activating existing third-party compression facilities.

Preparations continue to add two production wells in the Q10A field by means of one completion of an unfinished well and one side-track.

Furthermore, Tulip Oil is considering alternatives for field life extension with long term opex reductions and reserves additions.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceBusiness Developments & ProjectsExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago