Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›CWind Taiwan nets BOP contract for Formosa 1 offshore wind farm
Business & Finance

October 15, 2020 · about 5 years ago

CWind Taiwan nets BOP contract for Formosa 1 offshore wind farm

CWind Taiwan has been awarded a balance of plant (BOP) contract for the Formosa 1 offshore wind farm. The company is providing inspection and maintenance services to the 22 turbines at Formosa 1 Phase 1 and Formosa 1 Phase 2 sites, including internal and external inspections and painting. Under the

2 minutes read
  • LinkedIn
  • X
  • Email
A wind turbine technician climbing the yellow foundation of an offshore wind turbine

CWind Taiwan has been awarded a balance of plant (BOP) contract for the Formosa 1 offshore wind farm.

The company is providing inspection and maintenance services to the 22 turbines at Formosa 1 Phase 1 and Formosa 1 Phase 2 sites, including internal and external inspections and painting.

Under the contract, signed with Formosa 1 Wind Power Co. ltd (FOWI), CWind has deployed its Taiwan-flagged crew transfer vessel Ocean Surveyor 3 and its in-house technicians in September 2020.

Since Formosa 1 is the first offshore wind farm in Taiwan to move into the operations and maintenance (O&M) phase, the first team of Taiwanese technicians to graduate from CWind Taiwan’s Global Wind Organisation (GWO) training school will work on the project, alongside their colleague senior technicians from CWind in Europe.

The Ocean Surveyor 3 CTV and its crew have been supporting the Formosa 1 project out of the Nanliao fishing harbour since 2016, and now have extensive knowledge of the sea conditions and familiarity with the local authorities there. The company will use the same port for its BOP campaign too, saying that utilising this location increases project efficiency as transit time is minimised.

Formosa 1 entered commercial operation on 27 December 2019.

The 128 MW wind farm consists of the 8 MW Formosa 1 Phase 1, inaugurated in May 2017, and the 120 MW Formosa 1 Phase 2 which was officially commissioned in November 2019.

Formosa 1’s first phase comprises two Siemens Gamesa 4 MW turbines and the second phase features 20 Siemens Gamesa 6 MW turbines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago